Tag: Clash management tools

construction management

Top 5 reasons rework is witnessed during construction

Reading Time: 4 minutesRework is a process that no team or stakeholder would want to discover during construction. It means a small or major portion of the earlier design or layout needs to be redone to resolve the issue. Clashes or issues showing up on the field result in delays and unnecessary costs. Rework can damage proposed costs

Design Coordination

Why Design Coordination is an integral part of modern-day construction

Reading Time: 3 minutesInaccurate design coordination in the preconstruction stage can lead to rework, delays, and cost overruns. Inability to resolve interferences between various trades viz. Architecture, Structure, and MEPF equipment lead to onsite clashes. Coordination issues arise when the Architectural and structural layout and MEPF components do not align with each other. Design coordination is an essential

construction document management

Top 5 reasons construction document management delivers winning projects.

Reading Time: 5 minutesMcKinsey reports more than 98% of megaprojects are challenged by cost overages of up to 30%, and 77% of them are 40% behind schedule. As these stark challenges continue to inhibit stakeholder bottom lines, construction documentation management plays an important role in lowering time and costs. In this blog, we will continue to investigate construction