No Trade Observation Name Level Type Date
1 Mechanical PRIMARY BATH RM. B-1 A.3 Level 2 As-Built 06/19/2025
360 Image
Intent
Intent 1
Description: As per the design, the IDU unit was intended to be installed East-West. However, on-site, it appears installed North South.
2 Plumbing UNIT K 2BR (BATH RM) Level 2 As-Built 06/19/2025
360 Image
Intent
Intent 2
Description: As per the design intent the rectangular duct was a few inches towards the west but on-site its installed towards the east and then added with an elbow fitting turning towards left.
3 Plumbing UNIT K 2BR (PRIMARY BATH RM) Level 2 As-Built 06/19/2025
360 Image
Intent
Intent 4
4 Plumbing UNIT A 2BR Level 2 As-Built 06/17/2025
360 Image
Intent
Intent 4
Description: The routing of the domestic pipes does not match the model. The pipes were designed to turn only to the left, but on-site they also turn to the right and run parallel to the vent pipe.
5 Plumbing UNIT H1 BR (KITCHEN) Level 2 As-Built 06/18/2025
360 Image
Intent
Intent 5
Description: The vent pipe was designed to route into the sanitary pipe at a height of 4.8 feet from the floor, but on-site it continues straight downward into the floor slab.
6 Plumbing UNIT F 2BR (WH) Level 2 As-Built 06/18/2025
360 Image
Intent
Intent 6
Description: As per the design model, the vent pipe was intended to connect to the right sleeve; however, on-site it is connected to the middle sleeve
7 Plumbing UNIT X 3BR Level 2 As-Built 06/19/2025
360 Image
Intent
Intent 7
Description: As per the design model, the rectangular duct was intended to run straight toward the wall however, on-site it is first routed toward a nearby column and then redirected straight, contrary to the model routing
8 Plumbing UNIT Y 2BR (BATH RM) Level 2 As-Built 06/19/2025
360 Image
Intent
Intent 8
Description: As per the design intent, a branch pipe was to be routed alongside the vent pipe; however, it appears to be missing on-site
9 Plumbing UNIT Z 1BR (KITCHEN) Level 2 As-Built 06/19/2025
360 Image
Intent
Intent 9
Description: As per the design, the branch pipe was intended to be routed at mid-level; however, on site it is connected to the vent pipe near the slab level and then routed toward the sanitary pipe
10 Plumbing UNIT E 2BR (PRIMARY BATH RM) Level 2 As-Built 06/18/2025
360 Image
Intent
Intent 10
Description: As per the design, the branch pipe was intended to be routed at mid-level; however, on-site it is connected to the vent pipe near the slab level and then routed toward the sanitary pipe.
11 Plumbing UNIT E 2BR (LIVING) Level 2 As-Built 06/18/2025
360 Image
Intent
Intent 11
Description: As per the design model, only the vent pipe was to be present at this location; however, an additional unintended pipe has been installed on-site.
12 Plumbing UNIT E 2BR (KITCHEN) Level 2 As-Built 06/18/2025
360 Image
Intent
Intent 12
Description: As per the design model, the vent pipe was to be connected to a branch pipe at mid-level; however, the branch pipe is missing on-site.
13 Plumbing UNIT E 2BR W/D LAUNDRY Level 2 As-Built 06/18/2025
360 Image
Intent
Intent 13
Description: As per the design model, the vent pipe was to be connected to a branch pipe at mid-level; however, the branch pipe is missing on-site.
14 Plumbing UNIT C 1BR LAUNDRY Level 2 As-Built 06/18/2025
360 Image
Intent
Intent 14
Description: As per the design model, the sanitary pipe was intended to run straight downward; however, on-site there is a slight offset in the routing. Additionally, the horizontal pipe has been connected close to the floor, whereas the design specifies it to be 2.5 feet above floor level.
15 Plumbing UNIT C 1BR LAUNDRY W/D Level 2 As-Built 06/18/2025
360 Image
Intent
Intent 15
Description: As per the design intent, both the sanitary and vent pipes were to have branch connection on the bottom side however, these connection is absent on-site
16 Plumbing UNIT B 3BR PRIMARY BATH RM Level 2 As-Built 06/18/2025
360 Image
Intent
Intent 16
Description: As per the design, the vent pipe was suppose to be placed below and in close proximity to the sanitary pipe; however, on-site it has been installed parallel to it at the same level.
17 Plumbing B 1BR KITCHEN Level 2 As-Built 06/18/2025
360 Image
Intent
Intent 17
Description: The fire pipe was intended to be routed above the sanitary pipe as per the design, but on-site it has been installed below it.
Lens360 Logo Powered by iFieldSmart Logo
THANK YOU!
Your interest in smarter construction workflows means everything to us. Book a Demo
Let's continue building with clarity, confidence, and complete jobsite visibility.